oneplan
OnePlan is a GitHub-native, context-driven engineering workflow using Milestones (tracks), Issues (spec/plan), and Sub-issues (phases/tasks). Use for complex features/bugfixes that need structured planning, resumable execution, parallel tasks, and team coordination.
$ 安裝
git clone https://github.com/majiayu000/claude-skill-registry /tmp/claude-skill-registry && cp -r /tmp/claude-skill-registry/skills/productivity/oneplan ~/.claude/skills/claude-skill-registry// tip: Run this command in your terminal to install the skill
name: oneplan description: OnePlan is a GitHub-native, context-driven engineering workflow using Milestones (tracks), Issues (spec/plan), and Sub-issues (phases/tasks). Use for complex features/bugfixes that need structured planning, resumable execution, parallel tasks, and team coordination. metadata: author: giulioleone version: "1.0" compatibility: Works with VS Code Agent Skills. Optional GitHub CLI (gh) for local automation. allowed-tools: Read Write Bash(git:) Bash(gh:)
OnePlan (Context-Driven Engineering)
Questa skill implementa l’equivalente del workflow “Conductor” (file-based) ma con GitHub come backend e un’identità propria: OnePlan.
Idea guida: Measure twice, ship once.
Quick Reference
Struttura consigliata
- Track = GitHub Milestone
- Spec = Issue con label
oneplan/spec - Plan = Issue con label
oneplan/plan(parent) - Phase = Sub-issue del Plan con label
oneplan/phase - Task = Sub-issue (o sub-issue della Phase) con label
oneplan/task
Fallback (se le Sub-issues non sono abilitate nel repo):
- Phase = Issue normale nella milestone (titolo
[PHASE] ...) + linkata dal PLAN tramite task list - Task = Issue normale nella milestone (titolo
[TASK] ...) + linkata dalla PHASE tramite task list
Stati (label)
status/pending,status/in-progress,status/blocked,status/done
Regola d’oro
- Prima SPEC, poi PLAN, poi IMPLEMENT.
Cosa risolve rispetto al file-based
- Persistenza e collaborazione: tutto vive su GitHub.
- Gerarchia e parallelismo: sub-issues + dipendenze.
- Tracciamento: milestone progress, labels, assignees, review.
- Audit trail: commenti e PR collegate.
Workflow operativo
1) Setup (una volta per repo)
Obiettivo: standardizzare convenzioni e ridurre ambiguità.
- Crea labels OnePlan (vedi
references/LABELS_AND_STATES.md). - Aggiungi issue templates (vedi
references/ISSUE_TEMPLATES.md). - Crea (opzionale) una issue “contesto” sempre aperta:
- titolo:
[CONTEXT] Project context - label:
oneplan/context - contenuto: product goals, tech stack, workflow.
- titolo:
Output desiderato:
- Labels pronte
- Templates pronte
- Contesto centralizzato e condiviso
2) Creare un Track (Milestone)
Obiettivo: un contenitore unico per spec/plan/tasks.
- Crea milestone:
Track: <nome>. - Crea issue SPEC associata alla milestone:
- titolo:
[SPEC] <nome> - label:
oneplan/spec
- titolo:
- Crea issue PLAN associata alla milestone:
- titolo:
[PLAN] <nome> - label:
oneplan/plan
- titolo:
Nota: la SPEC deve essere “approvata” (anche solo via commento “LGTM / approved”) prima di creare task dettagliate.
3) Planning (gerarchico + parallelo)
Obiettivo: trasformare SPEC → fasi e task eseguibili.
Regole:
- Le Phase sono sequenziali salvo dichiarazione esplicita.
- Le Task dentro una phase possono essere parallele.
- Ogni task deve avere:
- “Definition of Done” verificabile
- dipendenze esplicite (se esistono)
- owner/assignee (se in team)
Algoritmo pratico di scomposizione:
- Estrarre requisiti/AC dalla SPEC.
- Raggruppare per aree (UI, API, DB, tests, deploy).
- Definire 3–6 phases:
- Setup/Scaffold
- Core implementation
- Edge cases
- Testing
- Docs/Release
- Per ogni phase, creare 2–6 task piccole, con verifica.
Parallelismo:
- Metti nella stessa phase task indipendenti.
- Usa dipendenze solo dove necessario.
Gerarchia senza Sub-issues (task lists)
Se non puoi creare sub-issues, usa le task list nel body del PLAN/PHASE:
- #123 [PHASE] Setup
- #124 [PHASE] Implementazione
E dentro una PHASE:
- #130 [TASK] Aggiungere toggle UI
- #131 [TASK] Persistenza preferenza
- #132 [TASK] Test e2e
4) Implement (resumable)
Obiettivo: eseguire una task per volta, mantenendo stato su GitHub.
Selezione “next task” (deterministica):
- Se esiste una task
status/in-progressassegnata a te → continua quella. - Altrimenti scegli la più piccola task
status/pending:- nella prima phase non completata
- non
status/blocked - con dipendenze soddisfatte
Ciclo di esecuzione per task:
- Metti
status/in-progress. - Esegui la modifica in repo (branch/commit/PR se necessario).
- Aggiorna la issue task:
- checklist di verifica spuntata
- link a PR/commit
- Metti
status/donee chiudi la issue task.
5) Status / Reporting
Obiettivo: visione rapida a milestone/phase/task.
Heuristics:
- Track progress = (issues chiuse nella milestone) / (issues totali nella milestone)
- Phase progress = (tasks chiuse nella phase) / (tasks totali)
6) Post-track Tech Debt pass (consigliato)
Obiettivo: dopo aver consegnato una milestone, ridurre il debito tecnico “fresco”.
Workflow consigliato:
- Quando una track è completa (0 issue aperte nella milestone), crea una issue di review tech-debt.
- Esegui la modalità
@techdebte trasforma i findings in issue piccole e prioritizzate.
Suggerimenti pratici:
@techdebt assess(panoramica)@techdebt smells,@techdebt complexity,@techdebt unused(se pertinente)
Nota: l’estensione può proporre automaticamente la creazione della issue di review quando la milestone è completa.
7) Sync opzionale (GitHub ⇄ repo)
Se vuoi “contesto locale” per far lavorare meglio l’agente (e facilitare review), puoi mantenere:
.conductor/product.md.conductor/tech-stack.md.conductor/workflow.md
Questi file sono derivati dal contesto GitHub (o viceversa). La fonte di verità resta GitHub.
Convenzioni di naming
- Milestone:
Track: <Titolo umano> - Issue type prefix:
[SPEC],[PLAN],[PHASE],[TASK] - Slug: kebab-case per file/branch (se usati)
Dipendenze (come rappresentarle)
Usa un blocco standard nel body:
- Depends on: #123, #124
- Blocks: #200
E quando blocchi una task:
- label
status/blocked - commento: motivo + cosa serve per sbloccare
Integrazione con Agent Planning
Quando serve progettazione “larga”:
- Usa un agente planner (es. “Plan”) per ricavare la scomposizione.
- Trascrivi il risultato nel PLAN issue creando phases/tasks come sub-issues.
Guardrail
- Non creare task “giganti”: target 0.5–2 ore ciascuna.
- Evita dipendenze cicliche.
- Non chiudere una task senza verifica scritta.
- Una sola task
in-progressper persona.
Reference
references/GITHUB_MAPPING.mdreferences/LABELS_AND_STATES.mdreferences/ISSUE_TEMPLATES.mdreferences/DEPENDENCIES.md
Repository